Welfare facilities sized to workforce and programme, specified to meet CDM 2015 and ready before mobilisation.
Welfare provision must be in place before work begins on site. CDM 2015 requires sanitary and washing facilities, drinking water, rest areas and facilities for changing and drying clothing. Late or inadequate provision can delay site start and expose the principal contractor to compliance risk. The principal contractor remains responsible for site welfare; we provide and install the facilities to meet the requirement it sets.
GeoModular assesses the site, sizes provision to headcount and programme duration, and installs, connects and commissions each unit ahead of mobilisation.
Welfare facilities need power, water and a route for waste. Availability of mains services is assessed at survey, and the provision is designed around what the site has. Where mains services are not available, or not yet connected, GeoModular provides a self-contained solution so the facilities are operational from day one.
| Service | Mains-connected | Off-grid |
|---|---|---|
| Power | Temporary supply from the network operator, or connection to an existing supply | Diesel generator or hybrid battery system with remote monitoring |
| Hot and cold water | Temporary water supply with metering and backflow protection | Fresh water tank and pump, filled by bowser; electric hot water from the power system |
| Toilets and waste | Connection to the foul sewer where consent is available | Waste holding tank emptied by a registered waste carrier, or recirculating toilet units |
| Heating and lighting | From the mains supply | From the generator or battery system |
All electrical installations are tested and certified to BS 7671, and waste is removed by registered carriers with full duty-of-care documentation.
Compliant welfare scaled to your workforce and programme duration.
Construction • Insurance reinstatement • Multi-site operations
Welfare is planned as part of the overall site layout, coordinated with access, services and other accommodation.
Provide headcount, location and start date to receive a response within 24 hours. Email info@geomodular.scot.
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
These cookies are needed for adding comments on this website.